Loading...
R-6569 RESOLUTION NO. 6569 RESOLUTION OF THE CITY COUNCIL OF BOULDER CITY, NEVADA, REPEALING RESOLUTION NO. 5536 AND REPLACING THE PUBLIC WORKS DEPARTMENT DEVELOPMENT SERVICE FEES WHEREAS, this Resolution is in accordance with Title 11, Chapter 39, Section 11 of the Boulder City Code; and WHEREAS, the Boulder City Public Works Department Development Service Fees have not been updated since February 2010; and WHEREAS, in accordance with the City's Financial Plan, rates and fees shall be adjusted regularly; and NOW, THEREFORE, BE IT RESOLVED that City Council establish the following rates as per the attached Development Services Fee Schedule, the Public Works Department Development Service Fees; and BE IT FURTHER RESOLVED that the City Manager has the right to adjust the rates from time to time to maintain compliance with the City's Financial Policies and state law; and BE IT FURTHER RESOLVED that the changes reflected in this Resolution become effective on January 1, 2017; and BE IT FURTHER RESOLVED On July 1 of 2017 and each subsequent year that this Resolution remains in effect, the Public Works Department Development Service Fees as adjusted annually, shall be increased by 2.5%. This annual increase shall apply to all fees depicted as a fixed cost; and BE IT FURTHER RESOLVED by the City Council that developers shall post a bond and pay fees for drainage improvements and perimeter walls, whether these improvements are to be publicly or privately maintained, unless otherwise approved by the City Engineer. DATED and APPROVED this 13th day of December, 2016. Rodney Woodbury, Mayor ATTEST: geheAil *Ct-- Lorene Krumm, City Clerk ER CITY aR![5 DE4 City of Boulder City Development Services Fee Schedule Description January 1, 2017 Fees Perm its Excavation Permit < 60 linear feet $300 Excavation Permit > 60 linear feet $300 + $1 per foot over 60' Non-Compliance work with out Permit Double Calculated Permit Fee Non-Compliance with Permit $100 per occurrence Driveway/Sidewalk Permit $95 Application for Deviation From Design Standards $50 Obstruction Permit $50 License Encroachment $50 Encroachment Violation Fee $100 per occurrence Electric Design Plans Consultant Cost + 10% Residential Electric Service Permit $75 App Fee, $250 after Permit is approved Commercial Electric Service Permit $75 App Fee, $250 after Permit is approved Non-Compliance work with out Permit Double Permit Fee Non-Compliance with Permit $100 per occurrence Hydrology Hydrology Study <5 Ac Consultant Cost + 10% Hydrology Stud 5 -320 Ac Consultant Cost + 10% Hydrology Stud 320 -2560 Ac Consultant Cost + 10% Hydrology Study >2560 Ac Consultant Cost + 10% Hydrology Stud 3rd+ Reviews Consultant Cost + 10% Hydrology Study Revision Consultant Cost + 10% Traff ic Traffic Study <5 Ac Consultant Cost + 10% Traffic Stud 5 -40 Ac Consultant Cost + 10% Traffic Stud 40 -320 Ac Consultant Cost + 10% Traffic Stud 320 -2560 Ac Consultant Cost + 10% Traffic Study >2560 Ac Consultant Cost + 10% Traffic Stud 3rd+ Reviews Consultant Cost + 10% Traffic Study Update <5 Ac Consultant Cost + 10% Traffic Study Update >5 Ac Consultant Cost + 10% 545 See Bond Calculation Form " The Public Works Director may waive the requirement for any study or permit depicted above and the associated fee, If in his /her determination it is not applicable for a project. 546 Temporary Traffic Control Plan $200 + $50 per day after 3rd day Temporary Traffic Control Plan Resubmittal $200 Temporary Traffic Control Plan Renewal $200 Non-Compliance work with out Permit Double Permit Fee Non-Compliance with Permit $170 per occurrence Civil Improvement Residential Plan Review $250 + $50 per acre Commercial Plan Review $250 + $50 per acre Industrial Plan Review $250 + $50 per acre Plan Check (Total Estimated Construction Cost)* 2.25% Plan Reproduction (per sheet $15 Improvement Agreement $50 Plan Revision $380 Utility Investigation $50 Application Fee per lot Inspection 1st $25,000 (Total Estimated Construction Cost)" 7.50% Inspection next $75,000 (Total Estimated Construction Cost)" 6.50% Inspection over $100,000 (Total Estimated Construction Cost)" 4.30% Re-Inspection $85 Same Da One hour minimum $85 per hour Overtime Inspection Fee on Friday (Two hour minimum ) $85 per hour Bond Replacement $500 Bond Progress Reduction $550 Bond Final Reduction $550 Bond Maintenance /Release Re laced See Bond Calculation Form " The Public Works Director may waive the requirement for any study or permit depicted above and the associated fee, If in his /her determination it is not applicable for a project. 546 J�pE� c�Ty Qo., City of Boulder City Development Services Fee Comparison Chart Description Current Fees Proposed Fees Perm its Excavation Permit < 60 linear feet $300 $300 Excavation Permit > 60 linear feet $300 + $1 per foot over 60' $300 + $1 per foot over 60' Non - Compliance work with out Permit NA Double Calculated Permit Fee Non-Compliance with Permit NA $100 per occurrence Driveway/Sidewalk Permit $95 $95 Application for Deviation From Design Standards NA $50 Obstruction Permit $50 $50 License Encroachment $50 $50 Encroachment Violation Fee NA $100 per occurrence Electric Design Plans Individual Calculation Consultant Cost + 10% Residential Electric Service Permit NA $75 App Fee, $250 after Permit is appr oved Commercial Electric Service Permit NA $75 App Fee, $250 after Permit is approved Non - Compliance work with out Permit NA Double Permit Fee Non-Compliance with Permit NA $100 per occurrence Hydrology Hydrology Study <5 Ac $750 Consultant Cost + 10% Hydrology Stud 5 -320 Ac $2,000 Consultant Cost + 10% Hydrology Stud 320 -2560 Ac $4,000 Consultant Cost + 10% Hydrology Study >2560 Ac $6,000 Consultant Cost + 10% Hydrology Stud 3rd+ Reviews $400 Consultant Cost + 10% Hydrology Study Revision $400 Consultant Cost + 10% Traff ic Traffic Study <5 Ac $500 Consultant Cost + 10% 547 Traffic Stud 5 -40 Ac $1,000 Consultant Cost + 10% Traffic Stud 40 -320 Ac $2,000 Consultant Cost + 10% Traffic Stud 320 -2560 Ac $4,000 Consultant Cost + 10% Traffic Study >2560 Ac $6,000 Consultant Cost + 10% Traffic Stud 3rd+ Reviews $250 Consultant Cost + 10% Traffic Study Update <5 Ac $100 Consultant Cost + 10% Traffic Study Update >5 Ac $250 Consultant Cost + 10% Temporary Traffic Control Plan $50 $200 + $50 per day after 3rd da Temporary Traffic Control Plan Resubmittal $50 $200 Temporary Traffic Control Plan Renewal $25 $200 Non - Compliance work with out Permit NA Double Permit Fee Non-Compliance with Permit NA $170 per occurrence Civil Improvement Residential Plan Review NA $250 + $50 per acre Commercial Plan Review NA $250 + $50 per acre Industrial Plan Review NA $250 + $50 per acre Plan Check (Total Estimated Construction Cost)" 2.25% 2.25% Plan Reproduction (per sheet $15 $15 Improvement Agreement $50 $50 Plan Revision $380 $380 Utility Investigation NA $50 Application Fee per lot Inspection 1st $25,000 (Total Estimated Construction Cost)* 7.50% 7.50% Inspection next $75,000 (Total Estimated Construction Cost)* 6.50% 6.50% Inspection over $100,000 (Total Estimated Construction Cost)* 4.30% 4.30% Re-Inspection $85 $85 Same Day (One hour minimum ) $85 per hour $85 per hour Overtime Inspection Fee on Friday Two hour minimum $85 per hour $85 per hour Bond Replacement $500 $500 Bond Progress Reduction $100 $550 Bond Final Reduction $550 $550 Bond Maintenance /Release $100 Replaced See Bond Calculation Form " The Public Works Director may waive the requirement for any study or permit depicted above and the associated fee, If in his /her determination it is not applicable for a project. 549